Construction of a Dual Vapour and Liquid Managment Still Head


PAGE 19
 




The first modification was to replace the "U" tubes with taps. I found a lot of cross flow in the system so thought that the taps may help. I made the fitting the same size for both so the change was easy. However the taps made no difference. I still had the pressure build up problem. Most probably if I could cure the pressure problem the "U" tubes would work.
 
 

NEXT    INDEX